China loans PHP 21B for Samal Island-Davao bridge project
Soon, resort island Samal will be just a bridge away from Davao City
25 articles tagged
Soon, resort island Samal will be just a bridge away from Davao City
The new Binondo-Intramuros Bridge is expected to serve at least 30,000 vehicles daily that pass between the 2 busy and historic districts of Intramuros and Binondo in the City of Manila
ADB co-finances the construction of 3 new Marikina bridges for PHP 9-billion
DPWH steadfast in completing the road widening works at Plaridel Bypass Rd by October ‘22
DPWH is all set to open the P3.39-billion Binondo-Intramuros Bridge next month
Construction of 2.3 kilometer Davao Tunnel in full swing, DPWH speeding up construction
After numerous reschedules, the Binondo-Intramuros Bridge may open in April
Upon completion, the 37-kilometer Laguna Lake Road will stretch from Bicutan to Calamba
The new bridge connecting BGC and Ortigas will be fully-open to the public tonight at midnight.
A new bypass road in Davao will be opened to the motoring public soon, complete with twin tunnels.
DPWH is fast-tracking construction of new Binondo-Intramuros Bridge that is hoped to benefit 30,000 vehicles daily. Though construction is moving as planned, outside factors are slowing its completion.
The first 18-kilometer section of the CLLEX is now open, hoping to speed up travel from Tarlac, Tarlac to Aliaga, Nueva Ecija.
BGC to Ortigas Center is now just 12-minutes away, as the DPWH opens the highly anticipated BGC-Ortigas Link Bridge.
New roads built through the government’s Build, Build, Build program have made these provinces closer to Metro Manila by easing mobility between these points and reducing travel time.
NLEX Connector reaches Manila, with the first section now reaching Jose Abad Santos in Manila.
By the third quarter of 2021, the Silang subsection of CALAX will be open to serve motorists.
Travel over the Angat River in Bulacan is faster and more scenic thanks to a new bridge completed by the DPWH.
New bridge to cut travel time from BGC and Ortigas to open in June
The Binondo-Intramuros bridge is now at 60%. It will be completed by Q4 this year.
DPWH promises 12-minute travel time with new the bridge connecting BGC to Ortigas, expected to be completed within the year.
Choose which cookies you’d like to allow. Privacy Policy
Required for core site functionality like navigation, security and accessibility. These cannot be disabled.
Help us understand how visitors use the site so we can improve content and performance.
Used to deliver relevant ads and measure campaign effectiveness across platforms. Also allows video thumbnails to load from YouTube.